Blue Giant BLUE GENIUS SERIES Manuale del Proprietario

Navigare online o scaricare Manuale del Proprietario per Dock station per dispositivi portatili Blue Giant BLUE GENIUS SERIES. Blue Giant BLUE GENIUS SERIES Owner`s manual Manuale Utente

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 28
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 0
DO NOT INSTALL, OPERATE OR SERVICE THIS PRODUCT UNLESS YOU HAVE READ AND
FULLY UNDERSTOOD THE ENTIRE CONTENTS OF THIS MANUAL. FAILURE TO DO SO MAY
RESULT IN PROPERTY DAMAGE, BODILY INJURY OR DEATH.
INSTALLATION & OWNER’S MANUAL
U-SERIES VERTICAL STORING DOCK LEVELER
with BLUE GENIUS
TM
CONTROLS
U-Series Vertical Storing Dock Leveler with Blue Genius™ Controls
Issue Date: October 30, 2012. REV.3 (Part# 038-722E)
BLUE GENIUS
TM
SERIES
WARNING
Vedere la pagina 0
1 2 3 4 5 6 ... 27 28

Sommario

Pagina 1 - BLUE GENIUS

DO NOT INSTALL, OPERATE OR SERVICE THIS PRODUCT UNLESS YOU HAVE READ AND FULLY UNDERSTOOD THE ENTIRE CONTENTS OF THIS MANUAL. FAILURE TO DO SO MAY RES

Pagina 2 - TABLE OF CONTENTS

7. INSTALLATION INSTRUCTIONS 1. Using slings rated for a minimum capacity of 3000 lbs, (1500 kg), sling the deck ass

Pagina 3

8. TEST OPERATION With the overhead door open, test operate the Vertical Storing Dock Leveler as follows to

Pagina 4 - 28217-3992

9. CONTROL STATION OPERATIONCONTROL STATION TYPE -Independent Vertical Dock Leveler CautionYELLOW LIGHT(Proceed With

Pagina 5 - CRUSH HAZARD

10. OPERATING INSTRUCTIONSwww.BlueGiant.comGold Series TMT ouc h C controlDISCONNECT POWERBEFORE OPENIN

Pagina 6 - XXXXXXXXXXX

10. OPERATING INSTRUCTIONSThe transport vehicle should never be allowed to depart with the lip plate resting on the

Pagina 7 - Maintenance Strut

10. OPERATING INSTRUCTIONSDeck RaisingMENU DISPLAY SCREEN:Lip RaisingDeck LoweringDeck Deployedwww.BlueGiant.comG

Pagina 8 - INSIDE BUILDING VIEW*

11. MAINTENANCEMAINTENANCE & SERVICE TIME INTERVALS FOR SPECIFIC DOCK COMPONENTS CHART !!Do not operat

Pagina 9 - CONDUIT INSTALL

! WARNINGP M C H E C K L I S T – DOCK EQUIPMENT Barricade Work Area CLEANRepairs?OKCHECK / ADJUST / LUBE Repairs?OK Check Main Lift Cylinde

Pagina 10

12. PARTS ILLUSTRATION - VERTICAL STORING DOCK 65281632115 172624278791018191312114231413143252221212223206A6B6C 16" 18"

Pagina 11 - Control Box Illustration

13. COMPONENT LIST - VERTICAL STORING DOCKITEM QTY. PART NO. DESCRIPTION1 1 23-003600 Back Frame Weld2 3 23-004069 Pivot Pin3 8 013-12

Pagina 12 - (Proceed With Caution)

TABLE OF CONTENTS1. ABOUT THE VERTICAL STORING DOCK LEVELER...

Pagina 13 - Above Level

14. RECOMMENDED SPARE PARTSPart #DescriptionQty Req'd23-003585 SERVICE STAND 11)DNATS ECIVRESROF( NIP TOVIP685300

Pagina 14 - MENU DISPLAY SCREEN:

15. VERTICAL STORING DOCK LEVELER POWER PACKVIEW SHOWN WITHOUT BRACKET19 1/16"484BLUEGIANT.COMSERIAL NO.MODEL NO.BLUE GIANTPART

Pagina 15 - Deck Raising

16. SHIPMENT KIT - VERTICAL STORING DOCK 67251413# on Diagram Part Name Part Number 1 3/1

Pagina 16 - Pivot Points (Light Oil)

www.BlueGiant.comGold Series TMeniusGlueBTou ch C ontro lDISCONNECT POWERBEFORE OPENING.READ AND FULLY UNDER-R#038-244EDo Not EnterProceed With

Pagina 17 - Date Inspected By

17. TROUBLESHOOTING PROBLEM CAUSEPROBLEM1. The velocity fuse located at the top of the deck cylinder is

Pagina 18

NOTESU-SERIES VERTICAL STORING DOCK LEVELER WITH BLUE GENIUS™ CONTROLS 23

Pagina 19

NOTESU-SERIES VERTICAL STORING DOCK LEVELER WITH BLUE GENIUS™ CONTROLS 24

Pagina 20 - Qty Req'd

NOTESU-SERIES VERTICAL STORING DOCK LEVELER WITH BLUE GENIUS™ CONTROLS 25

Pagina 21 - MOTOR END

85 Heart Lake Road SouthBrampton, Ontario, Canada L6W 3K2Phone : 905-457-3900 Fax : 905-457-2313www.BlueGiant.comBLUE GIANT EQUIPMENT CORPORATION© 20

Pagina 22

1. ABOUT THE VERTICAL STORING DOCK LEVELERThe Blue Giant U-Series Vertical Storing Dock Leveler provides a complete energy efficient

Pagina 23 - PROBLEM

Loading Dock Equipment ManufacturersA Product Section of Material Handling Industry of America,A Division of Material Handling Industry8720 Red Oak Bl

Pagina 24

3.1 OPERATIONAL SAFETY WARNINGS• ONLY TRAINED PERSONNEL should operate or service this equipment.• DO NOT operate lev

Pagina 25

4. LOCKOUT / TAGOUT PROCEDURE and RULESXXXXXXXXXXXXXXXXXXXXXXXOPERATEDO NOTABOVE: APPROVED WAY TO LOCKOUT / TAGOUTIn accordance wi

Pagina 26

5. MAINTENANCE STRUT SETUP :Correct way to LOCK IN Maintenance Strut.Move Maintenance Strut From Stored Positi

Pagina 27

6. STANDALONE VS DOCK ARRANGEMENTMOTOR WIRING (to Blue Genius control station)NOTE: FUSED DISCONNECT BY OTHERS BLUE GENIUS CO

Pagina 28

7. INSTALLATION INSTRUCTIONSCONDUITACCESSHOLE 3” x 3” x 1/4”CURB ANGLE(supplied by others)REAR CURBCHANNEL ANDFRAME

Commenti su questo manuale

Nessun commento